http://my28chev.blogspot.com.au/2015/01/kevs-chev-another-aussie-28-tourer_50.html
The latest update as at 9th March 2015 is posted below
New fully sealed front and rear bearings fitted and bronze bushing between input and output shaft
After removing head have decided to have block bored out to 30 thou oversize and fit new pistons and rings
The latest update as at 9th March 2015 is posted below
Engine was cleaned and the old paint stripped off
Gearbox pre stripping
Cluster gears and bottom shafts in very good condition
Gear selector repaired and top tower pins replaced
New fully sealed front and rear bearings fitted and bronze bushing between input and output shaft
All back together ready to paint
After removing head have decided to have block bored out to 30 thou oversize and fit new pistons and rings
Head is good with new valves fitted
Original pistons. Bearings and lifters are serviceable and will be reused
My home made spray booth ready for work with the stripped chassis prior to sending away for sandblasting
The old paint looked ok but peeled off
Sandblasted and ready for painting
The painting process has began.
Next was the Gearbox
And at last the chassis, which came up very nice indeed.
Now let the assembly of this Chevy begin...............
No comments:
Post a Comment